EOKO Residential Bifold Folding Door Low-E Glass Aluminum Bi Folding Accordion Bifold Exterior Door for Construction Contractors

Product Description

Product Display 1
Product Display 2
Product Display 3
Product Display 4
Product Display 5
Product Display 6

Product Details & Specifications

Technical Specifications Overview
Category Specification / Alloy Type Wall Thickness / Structure Surface Treatment & Color Options
Aluminum Profiles 6063-T5 Aluminum Alloy 1.8mm – 2.0mm Anodized, Silver & Bronze
Powder Coating (Color to Be Confirmed with Buyer)
Electrophoresis, Silver & Champagne
PVDF
System Feature: Thermally Broken Aluminum System Design for Better Energy Saving Performance
Category Glass Type Glass Thickness Color Options
Glass Float Glass Single Glazing: 5 mm–15 mm;
Double Glazing with 6A/9A/12A/24A Space
Clear / Ultra Clear / Tinted / Blue / Green / Coffee Brown / Gray
Insulated Double Glass / Double Insulated Glass
Insulated Triple Glass / Triple Insulated Glass
Profile Specification 1
Profile Specification 2

Customer Case

Customer Project 1
Customer Project 2
Customer Project 3

Casement Window Opening Types

Customized and design window configurations

Opening Type Option 1
Opening Type Option 2
Opening Type Option 3
Opening Type Option 4
Opening Type Option 5
Opening Type Option 6

Argon Gas Filled Glass

No air leakage / No fogging / Quieter high pressure resistance

Argon Gas Filled Insulation

Glass Type Options

Glass Variant 1
Glass Variant 2
Glass Variant 3

Product Classification Module

One-stop whole house windows and doors

Window and Door Classification
Full House System Showcase

After-Sales Service Support

If damage occurs during transport, clients should provide clear photos and videos of the packaging, product, and delivery. EOKO will review the order and shipping details and assist with a solution, such as replacement parts, repair guidance, or claim support.
Pre-delivery inspection
Products are intact prior to delivery
Claim review
After damage provide clear photos, and a decision will be made within 24 hours
Replacement fulfillment
Replacement parts will be sent after confirmation
After-Sales Guarantee Workflow

Packing Method

For different products, we use different packing methods

EPE Foam Packaging
EPE Foam Packaging
Packed With Wooden Frames
Packed With Wooden Frames
Packed In Wooden Cases
Packed In Wooden Cases
Packaging Standard Overview
Crate Detail 1
Crate Detail 2
Crate Detail 3
Each product is carefully packed with protective materials and reinforced wooden crates to ensure maximum stability and minimize the risk of damage during transportation and delivery.

Frequently Asked Questions

Everything you need to know about ordering and fulfillment

Q1: What is the Minimum Order Quantity (MOQ)?
The minimum order quantity is 1 Square Meter, making it flexible for both residential customizations and bulk commercial projects.
Q2: What is the production and delivery lead time?
The standard delivery and lead time is approximately 25 Days upon order confirmation and design specification sign-off.
Q3: What installation options and support do you provide?
We offer three flexible options:
1. EOKO Chinese Installation Team dispatched on-site.
2. Certified overseas installation partner available in your country.
3. Comprehensive EOKO online installation guidance and technical support.
Q4: How do I get started with an inquiry or quotation?
Contact our team with your email address and phone number. If you already have architectural drawings or size requirements, please share them with us for an accurate custom quote.
Q5: How does EOKO handle damage during transport?
If any item arrives damaged, provide clear photos and videos of the packaging and product. Our support team reviews all details and provides an actionable resolution within 24 hours, including dispatching free replacement parts when confirmed.
Q6: What aluminum and glazing options are available?
We utilize 6063-T5 aluminum profiles (1.8mm–2.0mm thickness) with anodized, powder-coated, electrophoretic, or PVDF finishes. Glazing options include single, double, or triple insulated glass filled with argon gas for enhanced thermal and acoustic insulation.
Contact and Inquiries

Related Products